Multi-stop truck load planning: arrange cargo in delivery order

06.10.2026
time
5
time
5 min

Table of contents

Imagine a trailer with a high fill rate that forces the driver to move other orders at the first stop just to reach the delivery. On multi-drop routes, access in delivery order can matter more than the last few percent of occupied volume.

Multi-stop truck load planning: arrange cargo in delivery order: illustrative cargo and loading-space scene.
Illustration of the planning scenario, not a calculated or secured loading plan.
In this guide

Last in, first out

For a vehicle unloaded only through the rear, start with last-in, first-out planning: goods for the first delivery stay accessible near the doors, while later deliveries are placed deeper inside. Side unloading or special handling can require a different arrangement.

When a stop, quantity or order changes, recheck the whole arrangement. The previous plan may no longer provide access in the required order.

Illustrative three-stop route with rear-only unloading
Delivery orderCargo groupStarting placement principle
1Stop AAccessible nearest the rear doors
2Stop BBehind A in the unloading sequence
3Stop CDeeper in the loading space

Check the departure state, the state after A and the state after B. Access and weight distribution must remain acceptable in the actual unchanged positions of the remaining cargo.

Grouping is the mechanism

The practical solution is to stop treating the trailer as one space full of assorted items. Group the cargo by delivery point, give each group the name of the stop, and plan groups rather than individual cartons.

CargoTetris supports cargo groups and a loading-sequence option. Arrange groups in the required order in the cargo-addition tab, then inspect the result. Reverse route order is a starting point for rear unloading, not a guarantee of access in every layout.

When the route changes, you change the group order and recalculate rather than rebuilding the plan.

The trade-off, stated honestly

Delivery-order restrictions can reduce the range of available arrangements and may reduce fill rate. A gap near the doors is not useful if filling it blocks the first delivery. Compare the actual alternatives before assuming a fixed trade-off.

For an illustrative time comparison, ten minutes of restacking at each of four stops totals 10 × 4 = 40 minutes. This is an example, not a measured CargoTetris saving. Record your actual handling time and compare it with the capacity and cost of the alternative plan.

Weight distribution changes as the truck empties

This is the part multi-drop planning most often misses. A trailer that passes its axle check when fully loaded can fail it after the first two stops, because the remaining cargo is concentrated at the front.

Removing goods changes the remaining mass and its position. The direction and size of the axle-load change depend on vehicle geometry and on which cargo is removed; it cannot be inferred from the departure cargo total alone.

The results panel reports the configured plan's axle and coupling readings. Review the important intermediate states using the actual remaining cargo and unchanged positions of the goods still on board. A new calculation that rearranges the remaining goods cannot by itself validate their physical positions after an actual delivery.

What the driver receives

Use the step-by-step view and the available PDF or Excel report to explain the intended loading and unloading order. Check the final instructions against the route and the actual vehicle access before departure.

Try it on a real route

Take a route you run regularly and plan it twice: once for maximum fill, once grouped in delivery order. Compare the fill rates, then compare that difference against the time your drivers currently spend restacking.

Actual CargoTetris interface with a 3D truck loading demonstration and a results panel.
Actual CargoTetris product demonstration. This screen shows a truck load, not a calculation of the illustrative inputs in this article.

Watch the CargoTetris workflow

See the English product walkthrough, from cargo data to loading instructions. Duration: 7:52.

Preview of the official CargoTetris product walkthrough.

Start with your own cargo list

Create an account, enter a representative shipment and review the available planning workflow with your team.

Continue to complete registration in the app.

Read also

Article preview
Pallet loading patterns: a 53-foot trailer example
Compare the same cargo on the same usable floor. See how orientation changes the number of positions, remaining space and questions to check before loading.
22.09.2026
261
7 min

Article preview
Load planning software vs Excel: when manual planning stops scaling
Compare a basic Excel cargo list with 3D load planning. Review placement, cargo rules and a real product demonstration, then test your own shipment.
28.09.2026
148
7 min

Article preview
Truck loading software: build a 3D load plan before dispatch
Turn a cargo list into a 3D truck loading plan. Check the vehicle inputs, read the axle results and prepare the loading team before dispatch.
05.10.2026
27
7 min